Burntwood

Between 2009 - 2012 I worked as part of a four person team at AHMM Architects to redesign the Burntwood secondary school campus. I was primarily responsible for design and co-ordination of the innovative faceted precast facades for five new buildings. These were developed in detail with a fantastic subcontractor, Techrete. A cleverly optimised panel catalogue provides visual variation through minimum mould types — subtle on long elevations, and more playful on flank elevations.